In the Linux kernel, the following vulnerability has been resolved: sched/fair: Fix fault in reweight_entity Syzbot found a GPF in reweight_entity. This has been bisected to commit 4ef0c5c6b5ba ("kernel/sched: Fix sched_fork() access an invalid sched_task_group") There is a race between sched_post_fork() and setpriority(PRIO_PGRP) within a thread group that causes a null-ptr-deref in reweight_entity() in CFS. The scenario is that the main process spawns number of new threads, which then call setpriority(PRIO_PGRP, 0, -20), wait, and exit. For each of the new threads the copy_process() gets invoked, which adds the new task_struct and calls sched_post_fork() for it. In the above scenario there is a possibility that setpriority(PRIO_PGRP) and set_one_prio() will be called for a thread in the group that is just being created by copy_process(), and for which the sched_post_fork() has not been executed yet. This will trigger a null pointer dereference in reweight_entity(), as it will try to access the run queue pointer, which hasn't been set. Before the mentioned change the cfs_rq pointer for the task has been set in sched_fork(), which is called much earlier in copy_process(), before the new task is added to the thread_group. Now it is done in the sched_post_fork(), which is called after that. To fix the issue the remove the update_load param from the update_load param() function and call reweight_task() only if the task flag doesn't have the TASK_NEW flag set.
| Métrique | Valeur | Interprétation |
|---|---|---|
|
AV (Vecteur d'Attaque)
Attack Vector
|
Local (L)
|
Exploit nécessite un accès local au système |
|
AC (Complexité d'Attaque)
Attack Complexity
|
High (H)
|
Conditions spécifiques doivent être réunies pour exploiter |
|
PR (Privilèges Requis)
Privileges Required
|
Low (L)
|
Authentifié avec compte utilisateur basique |
|
UI (Interaction Utilisateur)
User Interaction
|
None (N)
|
Aucune interaction utilisateur nécessaire |
|
S (Périmètre)
Scope
|
Unchanged (U)
|
Impact reste dans le périmètre du composant compromis |
|
C (Impact Confidentialité)
Confidentiality Impact
|
None (N)
|
Aucune divulgation d'informations |
|
I (Impact Intégrité)
Integrity Impact
|
None (N)
|
Aucune modification de données possible |
|
A (Impact Disponibilité)
Availability Impact
|
High (H)
|
Interruption totale du service possible |
sched/fair: Fix fault in reweight_entity